Realizations
- Current maintenance and renovation of traffic lights at the territory of the city of Wrocław.
- Operation and renovation of illumination of objects being in possession of Odium.
- Christmas illumination of streets and squares of Wrocław within the winter period of 2009/2010.
- Operation of street traffic lights in Wroclaw.
- Design and performance of traffic lights at the crossroad of the national road no 8 at km 16+810 in the locality of Duszniki Zdrój
- Construction of traffic lights at the crossroad of Trzebnicka Street and Kraszewski Street in Wrocław.
- Construction and reconstruction of traffic and technical infrastructure located beyond the cubature object, situated between the streets Powstańców Śląskich/ Swobodna/ Komandorska/ Nasypowa in Wrocław, indispensable for the realization of the plan called Arkady Wrocławskie.
